Sitting in the doctors office waiting room…
While I was waiting for my wife and daughter to get out of the exam room I figured out the time line on the new office. This doesn’t include the trim getting done. That can be done after we are moved in.
- Get the spackling done by 6/26
- Get the electric done by 6/26
- Get the painting done by7/6
- Get the flooring in by 7/12
That should be a good schedule to keep. The hardest part to meet is the spackling but if I work on it every night this week it should done.
Well the wife and daughter are out. She has throat infection, Sinus infection and a double ear infection…..go Avery.